Construction Administration

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player


Sustainable / Green
Practices


Interactive UA Map /
Parking Map

Employee Directory

Announcements

The section of University Boulevard between Hackberry Lane and Butler Field will be closed from May 9 to Aug. 4, to allow for new paving, medians and landscaping.  Sidewalks on the north side of the street will be open.  Campus locations will be accessible via clearly marked alternate routes and detours. Detour maps available here.

 

Estus Portal-Public Accessible

95% Closeout Meetings

Advertised Bids

How to be notified for future bids

Inspections Calendar

CSI Numbering System

Mandatory Pre-Bid Conference

Certified Bid Tabs

Pre-Construction Meetings

Construction-Public Area

Prequalifications

Design & Construction Project Status

Project Initiation Forms

Design Phase Deliverables

Public Forms

Design Standards

RFPs & RFQs

Disadvantaged Business Enterprise

Risk Point Meetings

(DBE) Information

Shutdowns and Closures

Drawing Reviews

 


Estus Portal-Login Required

Active Projects

Project Management Office

Building and Campus Information

Quarterly Project Reports

Construction-Secured Area

Universal Project Documents

Other Links

Access to Building Information Policy

Closures due to construction

Rose Towers Implosion


 

Address:
1205 14th Street
Box 870186
Tuscaloosa, AL 35487

 

Phone: (205) 348-5950
Fax: (205) 348-9105

or
(205) 348-1588

Link to FA Administration Link to Auxiliary Services Link to Finance Link to HR Link to Public Safety Link to UA Home Link to Facilities Home Link to Financial Affairs Link to Site Map